Joined
·
10,111 Posts
~I have three big projects on my list. Things that will take quite a bit of fabric and time.
#1: Covers for custom cut foam cushions for a small RV, needed by July 7
Status: 13 yards of fabric ordered, delivered and ready to cut. I have to finalize my cutting layout before breaking out the scissors.
#2: 4 dozen cloth diapers for my sister's baby, due Jan 1, but needed for the shower around late October-early November
Status: 8 tees used and some pieces cut out, a stack of a dozen t-shirts ready to use. I do need more t-shirts, maybe even 100 by the time I'm done, thread and maybe velcro. I'll be getting more shirts this weekend at a thrift that sells them for $.10 each.
#3: 60 backpacks for a church's women's weekend, needed March 2012
Status: need 20 yards of fabric-I picked a red bandanna print with white jersey straps but I'm not ordering the fabric until I'm almost done with the diapers. I do want these to be done this calendar year.
Of course I'll be doing regular sewing in between and throughout the process of these projects. But these big things are going to take a significant amount of my sewing time this year.
Anyone else working on something big?~
#1: Covers for custom cut foam cushions for a small RV, needed by July 7
Status: 13 yards of fabric ordered, delivered and ready to cut. I have to finalize my cutting layout before breaking out the scissors.
#2: 4 dozen cloth diapers for my sister's baby, due Jan 1, but needed for the shower around late October-early November
Status: 8 tees used and some pieces cut out, a stack of a dozen t-shirts ready to use. I do need more t-shirts, maybe even 100 by the time I'm done, thread and maybe velcro. I'll be getting more shirts this weekend at a thrift that sells them for $.10 each.
#3: 60 backpacks for a church's women's weekend, needed March 2012
Status: need 20 yards of fabric-I picked a red bandanna print with white jersey straps but I'm not ordering the fabric until I'm almost done with the diapers. I do want these to be done this calendar year.
Of course I'll be doing regular sewing in between and throughout the process of these projects. But these big things are going to take a significant amount of my sewing time this year.
Anyone else working on something big?~