Joined
·
16,194 Posts
As many of you know, we have alot of work going on here. Well to be more presise...not going on here. The concrete pad in specific. It was supposed to be poured Tuesday. they showed up late. It wasn't framed till wednesday...just between two huge rain storms. It rained yesterday and it wasn't done...still not done today. I can't move anything around till the mulch can be moved. mulch can't be moved till the lawn furniture can be moved (IE, the table, chairs, grill etc). they can't be moved till the concrete pad is in place and dry. Also the front yard needs to be rototilled and raked then seeded. DH decided that this weekend he will go camping and take ds. Leaving me and dd to do this. I can tell ya right now, I can't do it with a 2 year old. So that leaves doing all this on Monday and tuesday if we want it done for my mom and grams visit.
To top all this off, I have another sinus infection. I got put on antibiotics three days ago. It is slowly getting better, but it is hindered, I am sure by the stress.
Ok, i have vented a little bit, i feel a little better:bang:
To top all this off, I have another sinus infection. I got put on antibiotics three days ago. It is slowly getting better, but it is hindered, I am sure by the stress.
Ok, i have vented a little bit, i feel a little better:bang: